1870kW Weichai Baudouin 12M55 generator set completing final inspection before delivery
GUANGXI, CHINA INFRASTRUCTURE

1870kW Prime Power for a Highway Tunnel Project

The first Baudouin 12M55 unit delivered in Guangxi — single-unit megawatt-class power for a tunnel site the grid hasn't reached yet.

Prime Power 1870kW / 2337kVA Prime
Engine Brand Weichai Baudouin 12M55 (Common Rail)
Alternator EvoTec (IP23, H-Class)
Controller SmartGen (Auto Start, Remote Monitoring)

The Challenge

Highway construction through Guangxi's mountainous terrain runs ahead of the grid — the tunnel section that needs the most power is precisely where no utility connection exists. Tunnel boring support, ventilation fans, dewatering pumps, and the concrete batching plant together demand megawatt-class power around the clock, with heavy motor-starting loads and no tolerance for interruption while crews are working underground.

The contractor also had a regulatory requirement: the unit had to comply with China's Nonroad Stage III emission standard for construction machinery. They needed one large, efficient, compliant unit — not a farm of small gensets — delivered and commissioned on a construction timeline.

Our Solution

We delivered a 1870kW open-type genset built on the Weichai Baudouin 12M55 — the first unit of this platform delivered in Guangxi Province. The V12 engine uses high-pressure common-rail injection, meeting China Nonroad Stage III emissions while cutting fuel consumption against the mechanical-injection units this power class traditionally relied on.

The engine is paired with an EvoTec H-class alternator sized for the site's motor-starting demands, and the complete unit passed full-load factory testing before transport to the mountain site.

✓

High-pressure common-rail Baudouin 12M55 — China Nonroad Stage III compliant, with measurably lower fuel burn per kWh than mechanical-injection units of the same class.

✓

Single-unit megawatt-class output with an EvoTec alternator sized for heavy motor starting — ventilation fans and pump groups start direct-on-line without staggering site operations.

✓

Full-load factory acceptance test completed before dispatch, then commissioned on site by our engineers to match the contractor's construction schedule.

Project Gallery

The 1870kW Baudouin 12M55 unit completing final inspection before delivery — the first of its platform in Guangxi Province.
Open-type configuration with high-capacity radiator and EvoTec H-class alternator, ready for dispatch to the tunnel site.

The Result

The unit was commissioned on site to the contractor's schedule and now carries the tunnel section's full construction load as the site's sole power source. Common-rail fuel efficiency translates directly into fewer fuel deliveries up the mountain road — a logistics saving the contractor counts weekly — and the successful first delivery has established the 12M55 platform as the contractor's reference configuration for subsequent grid-isolated sections.

One 1870kW package now carries a complete tunnel worksite, demonstrating delivery capability at the 2MVA class for grid-isolated infrastructure projects.