Global Case Studies
Powering The
Impossible.
Explore how our Cummins, MTU, and Weichai generator sets (20-3572kVA) deliver uncompromised reliability across marine and industrial applications worldwide.
Dealer-Built Cummins Packages for a Hyperscale Data Center Campus
Six QSK60-powered packages delivered in 28 weeks to the same acceptance standard as OEM factory units.
Dealer-Built Cummins Packages for a Hyperscale Data Center Campus
Johor, Malaysia
1870kW Prime Power for a Highway Tunnel Project
Guangxi, China
Twin Genset Power for an Offshore Aquaculture Platform
Sabah, Malaysia
Main and Harbor Gensets for a Coastal Cargo Vessel
Coastal Waters, China
N+1 Standby Power for a 400-Bed Acute Care Hospital
Abu Dhabi, UAE
Offshore Supply & Cable-Laying Vessel Power Retrofit
East China Sea, China
Auxiliary Power for a Coastal Night-Fishing Vessel
South Central Coast, Vietnam
Indonesia Distant-Water Trawler Fleet Power
ARAFURA SEA, INDONESIA
South Africa Gold Mine Continuous Power
Johannesburg, South Africa
Project Directory
A comprehensive log of our global installations.
| Project Name | Engine | Power | Location | Year |
|---|---|---|---|---|
| Dealer-Built Cummins Packages for a Hyperscale Data Center Campus | Cummins | 2500kVA x 6 | Johor, Malaysia | 2025 |
| 1870kW Prime Power for a Highway Tunnel Project | Weichai Baudouin 12M55 | 1870kW Prime | Guangxi, China | 2025 |
| Twin Genset Power for an Offshore Aquaculture Platform | Cummins 6BTA5.9-GM100 | 80kW x 2 | Sabah, Malaysia | 2025 |
| Main and Harbor Gensets for a Coastal Cargo Vessel | Weichai WP10CD238E200 / WP6CD150E200 | 200kW + 120kW | Coastal Waters, China | 2025 |
| N+1 Standby Power for a 400-Bed Acute Care Hospital | Cummins | 750kVA x 2 | Abu Dhabi, UAE | 2024 |
| Offshore Supply & Cable-Laying Vessel Power Retrofit | Cummins | 250kW x 2 + 140kW x 2 | East China Sea, China | 2019 |
| Auxiliary Power for a Coastal Night-Fishing Vessel | Raywin 4D24 | 30kW Prime | South Central Coast, Vietnam | 2024 |
| Indonesia Distant-Water Trawler Fleet Power | Cummins | 200kW x 2 (Marine) | ARAFURA SEA, INDONESIA | 2023 |
| South Africa Gold Mine Continuous Power | MTU | 1500kVA x 3 | Johannesburg, South Africa | February 2024 |