Solutions
Engineered For Your Worst Day.
Grid failure, vessel survey, well kick, fire inspection: power solutions are judged at the worst moment, not the best. We engineer Cummins, MTU, and Weichai generator systems (20–3572kVA) around the failure scenarios your industry actually faces.
Industry Solutions
Designed around the failure mode.
Each system starts with the duty cycle, acceptance standard, operating environment, and consequence of failure.
Data Center
Data Center Power
Factory lead times exceed 50 weeks. Your construction program doesn't have them.
View Solution
Marine & Offshore
Marine & Offshore Power
Class approval, MARPOL compliance, and repower dimensions: solved before the survey, not during it.
Hospital & Healthcare
Hospital & Healthcare Power
Ten seconds to load acceptance. One failed witness test sets the program back months.
Oil & Gas
Oil & Gas / Drilling Power
No grid, no second chances: black start capability and 24/7 duty at the wellsite.
Off-Grid & Island
Off-Grid & Island Power
Fuel is 60% of your cost and the nearest engineer is 500km away. Design for both.
Critical Infrastructure
Critical Infrastructure & Buildings
An ATS that fails on transfer is worse than no backup at all.
Capability Solutions
One supplier. Defined responsibility.
Prefabricated Power Module
Genset, switchgear, fire suppression: integrated and tested before it leaves the factory. One supplier, one responsibility.
02Mobile & Emergency Power
Disaster response is measured in minutes from arrival to power-on, not in kVA.
03Diesel + BESS Hybrid
Cut fuel consumption 25–40% and stop running your engines in the wet-stacking zone.
04Emissions & Aftertreatment
Stage V, Tier 4, IMO Tier III: configured for your destination before customs asks.
05Lifecycle Service & Post-Warranty Support
Out of warranty doesn't mean out of support. Repair, overhaul, and parts, including for gensets we didn't sell.
Optional Safety Package
Container Fire Suppression Package
Gas suppression engineered for genset and battery compartments: heat detection, automatic shutdown interlocks, and documentation ready for your insurer's review. Available on all containerized solutions.
Not sure which configuration fits?
Send us your load list. We'll return a sizing proposal within 48 hours.