Too many site interfaces
Separate vendors leave gaps between mechanical, electrical, controls, fuel, and fire systems.
Prefabricated Power Module
A prefabricated module moves interface risk from a congested site into a controlled factory. Generator sets, switchgear, fuel, ventilation, controls, and safety systems are assembled and tested under one package responsibility.
Operational Risks
Separate vendors leave gaps between mechanical, electrical, controls, fuel, and fire systems.
Site assembly and commissioning compete with civil works, access restrictions, and changing programs.
Cable, protection, airflow, and control conflicts are often discovered after equipment is installed.
When the system fails a test, each package supplier can point to another interface.
Solution Architecture
Structural module sized around transport, lifting, and service access.
Generator, switchgear, auxiliary, and control wiring completed in the factory.
CFD-informed airflow and heat rejection review for enclosed equipment.
Fuel, drainage, lighting, emergency stops, and maintenance services integrated.
Gas fire suppression, heat detection, shutdown interlocks, and ventilation logic.
Full functional FAT before shipment, including alarms and sequence testing.
Configuration Comparison
Base Configuration
Acoustic enclosure with integrated ventilation.
Generator protection and remote contacts.
Service lighting and emergency stop stations.
External supply and return connections.
Generator load test before shipment.
Optimized Configuration
Gensets, switchgear, controls, and auxiliaries integrated.
Protection, metering, synchronizing, and outgoing feeders.
Detection, gas release, shutdown, and insurer documentation.
Day tanks, pumps, polishing, containment, and leak detection.
Full sequence and interface testing before dispatch.
Optional Safety Package
Application Gallery
Scope of Supply
We will return a preliminary module layout and interface responsibility matrix.
Related Solutions
Use these related resources to prepare your requirements. Final equipment selection depends on the confirmed load, duty and installation conditions.
Industrial: duty and load profile, voltage / frequency / phase, installation conditions and control interfaces.
English, Indonesian and Russian have dedicated pages in the header menu. Other languages use automatic translation.